CVE-2026-95108
Received
Received - Intake
Memory Leak in ThreadX Module Manager
Vulnerability report for CVE-2026-95108, including description, CVSS score, EPSS score, affected products, exploitability, helpful resources, and attack-flow context.
Publication date: 2026-10-20
Last updated on: 2026-10-20
Assigner: Eclipse Foundation
Description
Description
One logical thread of a user-mode ThreadX module costs the Module Manager's shared object pool two allocations, not one. The module asks for a `TX_THREAD` control block through `txm_module_object_allocate`; `_txm_module_manager_thread_create` then takes a second allocation of `TXM_MODULE_KERNEL_STACK_SIZE` bytes for the privileged kernel stack that thread's system calls run on, and records it in the control block. Both come from `_txm_module_manager_object_pool` and both are linked onto the module's allocation list.
The Module Manager's thread-delete dispatcher released only the first. The kernel stack stayed allocated until the whole module was stopped, so a module that creates, terminates and deletes threads in a loop β every state transition valid, every service returning `TX_SUCCESS` β removed a fixed block from a finite pool shared by the manager and by every other loaded module, on every cycle, for as long as it stayed loaded. Once the pool is exhausted, no memory-protected module can create any kernel object and no user-mode module thread can be created anywhere in the system.
Vulnerable function: `_txm_module_manager_tx_thread_delete_dispatch`, in `common_modules/module_manager/inc/txm_module_manager_dispatch.h`.
CVSS Scores
EPSS Scores
| Probability: | |
| Percentile: |
Meta Information
Affected Vendors & Products
| Vendor | Product | Version / Range |
|---|---|---|
| Eclipse | Foundation | Eclipse ThreadX 6.0.1 |
Helpful Resources
Exploitability
| CWE ID | Description |
|---|---|
| CWE-772 | The product does not release a resource after its effective lifetime has ended, i.e., after the resource is no longer needed. |
| CWE-400 | The product does not properly control the allocation and maintenance of a limited resource. |